The corona crisis and the associated restrictions have been in place for several months now. During this period, ECG has taken the necessary measures to be able to continue working in a responsible manner. We have done this by setting up a corona grid with a maximum number of jobs. This stimulates working at home as much as possible. In addition, protection plates have been placed between the desks and disinfection columns have been placed along the footpaths in the building. All this means that, despite this unusual period, ECG can continue its work and, fortunately, can continue to do so in a responsible manner.